
RCC core cutting
Precise circular openings through reinforced concrete walls, beams and slabs for planned service routes.
Discuss this requirementFocused core drilling for RCC, concrete, slab, brick and civil-wall requirements in Chennai and suitable outstation locations.

Precise circular openings through reinforced concrete walls, beams and slabs for planned service routes.
Discuss this requirement
Horizontal and angled holes through concrete, brick and civil walls for pipes, cables and ducts.
Discuss this requirement
Vertical core drilling through RCC floors and slabs for plumbing, drainage and MEP penetrations.
Discuss this requirement
Measured penetrations for plumbing, electrical, air-conditioning, ventilation and firefighting services.
Discuss this requirement
A series of controlled core holes for larger openings where the site requirement calls for it.
Discuss this requirement
Planned core-cutting support for suitable residential, commercial and industrial projects beyond Chennai.
Discuss this requirement
Before drilling, the work location, material, depth, diameter and concealed services must be checked. Structural approval remains the customer or project authority’s responsibility where required.
Get a quotationEvery opening starts with the right measurements and a clear understanding of the site.
Get a quotationShare the site location, material, required hole diameter, wall or slab thickness, number of openings and clear photographs or video of the work area.
Yes. AK Core Cutting accepts suitable outstation requirements. Share the location and scope so travel, access and scheduling can be confirmed.
RCC core cutting is a key service. Before work begins, the site team must identify structural reinforcement, electrical lines, plumbing and other concealed services.
Yes. Core holes can be discussed for plumbing pipes, AC lines, drains, ducts, cable routes and other building-service penetrations.
No absolute dust-free promise is made. The work method and available controls depend on the material, equipment, access and site conditions. Wet cutting or suitable dust-control methods may be used where appropriate.
The team first confirms access, measurements, work position, power and water availability, safety conditions and any required structural approval.